Close

Not a member yet? Register now and get started.

lock and key

Sign in to your account.

Account Login

Forgot your password?

microtunnelling  // Posts tagged as "microtunnelling"

Projects | Comments Off

Dedicated Line to Pasay Pumping Station

Dedicated Line to Pasay Pumping Station

This project is a pipe-jacking work of 2300mm Ø Steel Casing that crossed Taft Ave. in P. Ocampo St. near Vito Cruz LRT Station. This is a part of Maynilad pipe-laying project that will supply water to the Pasay Pumping station.

Read more...

Projects | Comments Off

APM-06 Gaps, Gil Puyat, Pasay

APM-06 Gaps, Gil Puyat, Pasay

The diameter of the installed pipe is 900mm steel casing, 16mm thick. Length of the work is 70m. A 600mm Ø carrier pipe (pipe that will transport the water) will be installed inside steel casing, and the space in between will be grouted. This project is called APM-6 GAPS because this is one of the 'gaps' or uncompleted project from the original project APM.

Read more...