Project Name: Pipe jacking works of 2000mm Ø Pipe Casing for Gap 1 and Gap 2 along Roxas Boulevard, Parañaque City, under MWSI- Proposed Completion of MS-01 Gaps
Date: September 2007.
Client: Maynilad
Pipe-jacking work for MS-01 Gaps is located along Roxas Boulevard, Parañaque City. Two pipe jacking positions were performed: first is Gap 1 located along Roxas Boulevard, just across Bradco Street about 50m away from Baclaran church, second is Gap 2 located along Roxas Boulevard corner Airport Road. The task was to connect the two gaps by pipe jacking below concrete pavement and the reinforced concrete box culvert. The size of the pipe-jacking work was 2000m Ø steel casing. The carrier pipe was 1800mm Ø. This contract was secured by DMCI and Microtunnelling Const. Tech. sub-contracted the pipe-jacking works, Maynilad being the main client. The project was done on September 2007.