The diameter of the installed pipe is 900mm steel casing, 16mm thick. Length of the work is 70m. A 600mm Ø carrier pipe (pipe that will transport the water) will be installed inside steel casing, and the space in between will be grouted. This project is called APM-6 GAPS because this is one of the 'gaps' or uncompleted project from the original project APM.
© microtunnelling.com.ph, 2018