Project Name: Pipe jacking of 900mm Ø steel pipe for Drainage System, Cavite Eco-Zone, Rosario, Cavite
Date: August 2010
Client: HRD (S) PTE. LTD.
This is a project secured from a Japanese company, HRD (S) PTE. LTD. Located in the Cavite Eco-Zone, the contract was to install 900mm Ø steel pipe by pipe jacking under the existing reinforced concrete box culvert for their drainage system. The job was simple and was finished on August 20, 2010.
Trenchless Pipe laying of 1700mm Ø Steel Casing by Tunnel Boring Method- Supply and Discharge Pipelines for New Pasay Pump Station (Package 4)
MWSI- proposed 1400mm Ø Primary Lines along Alabang-Zapote Road, Las Piñas City (Package 12)
MWSI Proposed Supply and Discharge Pipelines for New Pasay Pump Station (Package 1), along Roxas Blvd. cor. Bradco St., Pasay City
Pipe jacking of 900mm Ø steel pipe for Drainage System, Cavite Eco-Zone, Rosario, Cavite
Proposed 250mm Ø Sewer Line along Taft Ave. cor. Quirino Ave. Manila
Replacement of Defective 650mm Ø Sewer Line along Rizal Ave. cor. Antipolo St. Manila
Pipe jacking works of 2300mm Ø Steel Casing for the MWSI- 2000 mm Ø Dedicated Line to Pasay Pumping Station, located along P. Ocampo Street crossing Taft Avenue, Manila
Pipe jacking works of 2000mm Ø Pipe Casing for Gap 1 and Gap 2 along Roxas Boulevard, Parañaque City, under MWSI- Proposed Completion of MS-01 Gaps
Completion of APM-06 GAPS (600mm Ø) pipe laying Package 3 along Gil Puyat Avenue (Domingo St.- P, Burgos St.), Pasay City