<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Microtunnelling Construction Tech. &#187; trenchless pipe laying</title>
	<atom:link href="http://microtunnelling.com.ph/tag/trenchless-pipe-laying/feed/" rel="self" type="application/rss+xml" />
	<link>http://microtunnelling.com.ph</link>
	<description>A quality service provider of construction and repair of underground utilities</description>
	<lastBuildDate>Tue, 06 Feb 2018 15:12:28 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.3.1</generator>
		<item>
		<title>Trenchless Pipe Laying for New Pasay Pump Station</title>
		<link>http://microtunnelling.com.ph/2012/04/01/trenchless-pipe-laying-for-new-pasay-pump-station/</link>
		<comments>http://microtunnelling.com.ph/2012/04/01/trenchless-pipe-laying-for-new-pasay-pump-station/#comments</comments>
		<pubDate>Sun, 01 Apr 2012 01:04:15 +0000</pubDate>
		<dc:creator>microtunnelling</dc:creator>
				<category><![CDATA[Projects]]></category>
		<category><![CDATA[discharge lines]]></category>
		<category><![CDATA[PAGCOR]]></category>
		<category><![CDATA[Pasay]]></category>
		<category><![CDATA[steel casing]]></category>
		<category><![CDATA[trenchless pipe laying]]></category>
		<category><![CDATA[tunnel]]></category>
		<category><![CDATA[tunnel boring]]></category>

		<guid isPermaLink="false">http://microtunnelling.com.ph/?p=305</guid>
		<description><![CDATA[This project is part of Maynilad project on the Water Discharge Pipelines from the New Pasay Pumping Station and Reservoir at PAGCOR entertainment complex. ]]></description>
			<content:encoded><![CDATA[<p><strong>Project Name</strong>: Trenchless Pipe laying of 1700mm Ø Steel Casing by Tunnel Boring Method- Supply and Discharge Pipelines for New Pasay Pump Station (Package 4)<br />
<strong>Date</strong>: September 2011<br />
<strong>Client</strong>: Maynilad</p>
<p>This project is part of Maynilad project on the Water Discharge Pipelines from the New Pasay Pumping Station and Reservoir at PAGCOR entertainment complex. The project was to tunnel below NAIA road so that water from the reservoir could be transported to the discharge lines heading to Las Piñas and Cavite. The tunnelling crossed Macapagal Boulevard and bored below NAIA Road extension towards Roxas Boulevard, Parañaque City, using a 1700mm Ø Steel Casing. Because it was rather long trenchless pipe laying, a tunnel boring machine was used. Researching on the site geology was significant. The work done was below the water table and so sump pump was used to keep the work pit dry. The tunnel boring machine deployed was Slurry Shield MJV 1700S. This was specifically suited for the soft and watery ground of the project. The soil at the tunnel face is cut and drawn into the cutting chamber, where it is pumped out as slurry. The whole pipe laying contract package was secured by J.V. Angeles Construction Corp. and the tunnelling portion sub-contracted by MCT. The project was completed in September 2011. </p>
<div class="ngg-galleryoverview" id="ngg-gallery-10-305">
<p>	<!-- Thumbnails --></p>
<div id="ngg-image-73" class="ngg-gallery-thumbnail-box"  >
<div class="ngg-gallery-thumbnail" >
			<a href="http://microtunnelling.com.ph/wp-content/gallery/trenchlesspipelaying/image140.jpg" title="Another view of the location of the work pit, with the pipe-alignment pointing to the right." class="thickbox" rel="set_10" ><br />
								<img title=" " alt=" " src="http://microtunnelling.com.ph/wp-content/gallery/trenchlesspipelaying/thumbs/thumbs_image140.jpg" width="100" height="75" /><br />
							</a>
		</div>
</p></div>
<div id="ngg-image-74" class="ngg-gallery-thumbnail-box"  >
<div class="ngg-gallery-thumbnail" >
			<a href="http://microtunnelling.com.ph/wp-content/gallery/trenchlesspipelaying/image141.jpg" title="This is the TBM Machine Frame being set-up. The jacking seal is placed around the perimeter of 1.7m ring flange seen here." class="thickbox" rel="set_10" ><br />
								<img title=" " alt=" " src="http://microtunnelling.com.ph/wp-content/gallery/trenchlesspipelaying/thumbs/thumbs_image141.jpg" width="100" height="75" /><br />
							</a>
		</div>
</p></div>
<div id="ngg-image-75" class="ngg-gallery-thumbnail-box"  >
<div class="ngg-gallery-thumbnail" >
			<a href="http://microtunnelling.com.ph/wp-content/gallery/trenchlesspipelaying/image143.jpg" title="Just delivered in the job site is a 400 ton Hydraulic Jacking Machine, MJV 400 ND 1700." class="thickbox" rel="set_10" ><br />
								<img title=" " alt=" " src="http://microtunnelling.com.ph/wp-content/gallery/trenchlesspipelaying/thumbs/thumbs_image143.jpg" width="100" height="75" /><br />
							</a>
		</div>
</p></div>
<div id="ngg-image-76" class="ngg-gallery-thumbnail-box"  >
<div class="ngg-gallery-thumbnail" >
			<a href="http://microtunnelling.com.ph/wp-content/gallery/trenchlesspipelaying/image145.jpg" title="The MJV 400 ND 1700 Hydraulic Jacking Machine being lowered into the work pit." class="thickbox" rel="set_10" ><br />
								<img title=" " alt=" " src="http://microtunnelling.com.ph/wp-content/gallery/trenchlesspipelaying/thumbs/thumbs_image145.jpg" width="100" height="75" /><br />
							</a>
		</div>
</p></div>
<div id="ngg-image-77" class="ngg-gallery-thumbnail-box"  >
<div class="ngg-gallery-thumbnail" >
			<a href="http://microtunnelling.com.ph/wp-content/gallery/trenchlesspipelaying/image149.jpg" title="Both the Tunnel Boring Machine and the Jacking Machine are set in place for the launch." class="thickbox" rel="set_10" ><br />
								<img title=" " alt=" " src="http://microtunnelling.com.ph/wp-content/gallery/trenchlesspipelaying/thumbs/thumbs_image149.jpg" width="100" height="75" /><br />
							</a>
		</div>
</p></div>
<div id="ngg-image-78" class="ngg-gallery-thumbnail-box"  >
<div class="ngg-gallery-thumbnail" >
			<a href="http://microtunnelling.com.ph/wp-content/gallery/trenchlesspipelaying/image151.jpg" title="As a part of the pre-launch operation, the lifting hooks are being removed by the crew." class="thickbox" rel="set_10" ><br />
								<img title=" " alt=" " src="http://microtunnelling.com.ph/wp-content/gallery/trenchlesspipelaying/thumbs/thumbs_image151.jpg" width="100" height="75" /><br />
							</a>
		</div>
</p></div>
<div id="ngg-image-132" class="ngg-gallery-thumbnail-box"  >
<div class="ngg-gallery-thumbnail" >
			<a href="http://microtunnelling.com.ph/wp-content/gallery/trenchlesspipelaying/image153.jpg" title="Shown is the steel casing and the Slurry Pump and Valve System at the work pit." class="thickbox" rel="set_10" ><br />
								<img title=" " alt=" " src="http://microtunnelling.com.ph/wp-content/gallery/trenchlesspipelaying/thumbs/thumbs_image153.jpg" width="100" height="75" /><br />
							</a>
		</div>
</p></div>
<div id="ngg-image-133" class="ngg-gallery-thumbnail-box"  >
<div class="ngg-gallery-thumbnail" >
			<a href="http://microtunnelling.com.ph/wp-content/gallery/trenchlesspipelaying/image155.jpg" title="This is the breakthrough of the MJV 1700S Tunnel Boring Machine at the exit work pit." class="thickbox" rel="set_10" ><br />
								<img title=" " alt=" " src="http://microtunnelling.com.ph/wp-content/gallery/trenchlesspipelaying/thumbs/thumbs_image155.jpg" width="100" height="75" /><br />
							</a>
		</div>
</p></div>
<div id="ngg-image-134" class="ngg-gallery-thumbnail-box"  >
<div class="ngg-gallery-thumbnail" >
			<a href="http://microtunnelling.com.ph/wp-content/gallery/trenchlesspipelaying/image157.jpg" title="The MJV 1700S Tunnel Boring Machine has come out and is being cut from the pipe train to be lifted." class="thickbox" rel="set_10" ><br />
								<img title=" " alt=" " src="http://microtunnelling.com.ph/wp-content/gallery/trenchlesspipelaying/thumbs/thumbs_image157.jpg" width="100" height="75" /><br />
							</a>
		</div>
</p></div>
<div id="ngg-image-135" class="ngg-gallery-thumbnail-box"  >
<div class="ngg-gallery-thumbnail" >
			<a href="http://microtunnelling.com.ph/wp-content/gallery/trenchlesspipelaying/image159.jpg" title="The MJV 1700S Tunnel Boring Machine has been lifted from the exit pit." class="thickbox" rel="set_10" ><br />
								<img title=" " alt=" " src="http://microtunnelling.com.ph/wp-content/gallery/trenchlesspipelaying/thumbs/thumbs_image159.jpg" width="100" height="75" /><br />
							</a>
		</div>
</p></div>
<div id="ngg-image-136" class="ngg-gallery-thumbnail-box"  >
<div class="ngg-gallery-thumbnail" >
			<a href="http://microtunnelling.com.ph/wp-content/gallery/trenchlesspipelaying/image161.jpg" title="This is an image of the MJV 1700S Tunnel Boring Machine from its recent deployment, all covered in dirt and rust after it has been used." class="thickbox" rel="set_10" ><br />
								<img title=" " alt=" " src="http://microtunnelling.com.ph/wp-content/gallery/trenchlesspipelaying/thumbs/thumbs_image161.jpg" width="100" height="75" /><br />
							</a>
		</div>
</p></div>
<p>	<!-- Pagination --></p>
<div class="ngg-clear"></div>
</div>
]]></content:encoded>
			<wfw:commentRss>http://microtunnelling.com.ph/2012/04/01/trenchless-pipe-laying-for-new-pasay-pump-station/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>MWSI Proposed Pipelines for New Pasay Pump Station</title>
		<link>http://microtunnelling.com.ph/2010/12/01/mwsi-proposed-pipelines-for-new-pasay-pump-station/</link>
		<comments>http://microtunnelling.com.ph/2010/12/01/mwsi-proposed-pipelines-for-new-pasay-pump-station/#comments</comments>
		<pubDate>Wed, 01 Dec 2010 00:05:36 +0000</pubDate>
		<dc:creator>microtunnelling</dc:creator>
				<category><![CDATA[Projects]]></category>
		<category><![CDATA[microtunnelling]]></category>
		<category><![CDATA[MWSI]]></category>
		<category><![CDATA[PAGCAR]]></category>
		<category><![CDATA[Pasay City]]></category>
		<category><![CDATA[pipelines]]></category>
		<category><![CDATA[pump station]]></category>
		<category><![CDATA[trenchless pipe laying]]></category>

		<guid isPermaLink="false">http://microtunnelling.com.ph/?p=291</guid>
		<description><![CDATA[This is a portion of the Maynilad project that is to supply water to the New Pasay Pumping Station and Reservoir newly built at PAGCOR entertainment complex. Using 2100mm Ø steel casing, the line installed crossed Roxas Blvd. towards the reservoir. ]]></description>
			<content:encoded><![CDATA[<p><strong>Project Name</strong>: MWSI Proposed Supply and Discharge Pipelines for New Pasay Pump Station (Package 1), along Roxas Blvd. cor. Bradco St., Pasay City<br />
<strong>Date</strong>: December 2010<br />
<strong>Client</strong>: Maynilad</p>
<p>This is a portion of the Maynilad project that is to supply water to the New Pasay Pumping Station and Reservoir newly built at PAGCOR entertainment complex. Using 2100mm Ø steel casing, the line installed crossed Roxas Blvd. towards the reservoir. The entry work pit was located at Roxas Blvd., corner Ortigas street just in front of Metrobank in Pasay City. The main contractor was A. A. Ararilla, and MCT was the subcontractor for the trenchless pipe laying. This was done in December 2010.</p>
<div class="ngg-galleryoverview" id="ngg-gallery-8-291">
<p>	<!-- Thumbnails --></p>
<div id="ngg-image-56" class="ngg-gallery-thumbnail-box"  >
<div class="ngg-gallery-thumbnail" >
			<a href="http://microtunnelling.com.ph/wp-content/gallery/newpasaypump/image115.jpg" title="Set-up of the 2100mm steel casing in the 400 ton hydraulic jacking machine, shown from the entry work pit." class="thickbox" rel="set_8" ><br />
								<img title=" " alt=" " src="http://microtunnelling.com.ph/wp-content/gallery/newpasaypump/thumbs/thumbs_image115.jpg" width="100" height="75" /><br />
							</a>
		</div>
</p></div>
<div id="ngg-image-57" class="ngg-gallery-thumbnail-box"  >
<div class="ngg-gallery-thumbnail" >
			<a href="http://microtunnelling.com.ph/wp-content/gallery/newpasaypump/image117.jpg" title="This is a view from inside the 2100mm steel casing; the tunnelling crew gathering the spoil from the boring face." class="thickbox" rel="set_8" ><br />
								<img title=" " alt=" " src="http://microtunnelling.com.ph/wp-content/gallery/newpasaypump/thumbs/thumbs_image117.jpg" width="100" height="75" /><br />
							</a>
		</div>
</p></div>
<div id="ngg-image-58" class="ngg-gallery-thumbnail-box"  >
<div class="ngg-gallery-thumbnail" >
			<a href="http://microtunnelling.com.ph/wp-content/gallery/newpasaypump/image119.jpg" title="The 2100mm  steel casing is being lowered for the next segment of the pipe-jacking" class="thickbox" rel="set_8" ><br />
								<img title=" " alt=" " src="http://microtunnelling.com.ph/wp-content/gallery/newpasaypump/thumbs/thumbs_image119.jpg" width="100" height="75" /><br />
							</a>
		</div>
</p></div>
<div id="ngg-image-59" class="ngg-gallery-thumbnail-box"  >
<div class="ngg-gallery-thumbnail" >
			<a href="http://microtunnelling.com.ph/wp-content/gallery/newpasaypump/image121.jpg" title="Newly lowered 2100mm steel casing being fitted for welding." class="thickbox" rel="set_8" ><br />
								<img title=" " alt=" " src="http://microtunnelling.com.ph/wp-content/gallery/newpasaypump/thumbs/thumbs_image121.jpg" width="100" height="75" /><br />
							</a>
		</div>
</p></div>
<div id="ngg-image-60" class="ngg-gallery-thumbnail-box"  >
<div class="ngg-gallery-thumbnail" >
			<a href="http://microtunnelling.com.ph/wp-content/gallery/newpasaypump/image123.jpg" title="Spoil being loaded for lifting and disposal." class="thickbox" rel="set_8" ><br />
								<img title=" " alt=" " src="http://microtunnelling.com.ph/wp-content/gallery/newpasaypump/thumbs/thumbs_image123.jpg" width="100" height="75" /><br />
							</a>
		</div>
</p></div>
<div id="ngg-image-61" class="ngg-gallery-thumbnail-box"  >
<div class="ngg-gallery-thumbnail" >
			<a href="http://microtunnelling.com.ph/wp-content/gallery/newpasaypump/image125.jpg" title="The newly cut sheet piles is being lifted to give way for the tunnel breakthrough." class="thickbox" rel="set_8" ><br />
								<img title=" " alt=" " src="http://microtunnelling.com.ph/wp-content/gallery/newpasaypump/thumbs/thumbs_image125.jpg" width="100" height="75" /><br />
							</a>
		</div>
</p></div>
<div id="ngg-image-62" class="ngg-gallery-thumbnail-box"  >
<div class="ngg-gallery-thumbnail" >
			<a href="http://microtunnelling.com.ph/wp-content/gallery/newpasaypump/image127.jpg" title="An image of the actual breakthrough of the 2100mm steel encased tunnel at the exit work pit across the other side of Roxas Blvd." class="thickbox" rel="set_8" ><br />
								<img title=" " alt=" " src="http://microtunnelling.com.ph/wp-content/gallery/newpasaypump/thumbs/thumbs_image127.jpg" width="100" height="75" /><br />
							</a>
		</div>
</p></div>
<p>	<!-- Pagination --></p>
<div class="ngg-clear"></div>
</div>
]]></content:encoded>
			<wfw:commentRss>http://microtunnelling.com.ph/2010/12/01/mwsi-proposed-pipelines-for-new-pasay-pump-station/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
