<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Microtunnelling Construction Tech. &#187; APM-06</title>
	<atom:link href="http://microtunnelling.com.ph/tag/apm-06/feed/" rel="self" type="application/rss+xml" />
	<link>http://microtunnelling.com.ph</link>
	<description>A quality service provider of construction and repair of underground utilities</description>
	<lastBuildDate>Tue, 06 Feb 2018 15:12:28 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.3.1</generator>
		<item>
		<title>APM-06 Gaps, Gil Puyat, Pasay</title>
		<link>http://microtunnelling.com.ph/2007/05/10/apm-06-gaps-gil-puyat-pasay/</link>
		<comments>http://microtunnelling.com.ph/2007/05/10/apm-06-gaps-gil-puyat-pasay/#comments</comments>
		<pubDate>Thu, 10 May 2007 19:12:12 +0000</pubDate>
		<dc:creator>microtunnelling</dc:creator>
				<category><![CDATA[Projects]]></category>
		<category><![CDATA[APM-06]]></category>
		<category><![CDATA[GAPS]]></category>
		<category><![CDATA[Gil Puyat]]></category>
		<category><![CDATA[Linear Construction Corporation]]></category>
		<category><![CDATA[Maynilad]]></category>
		<category><![CDATA[microtunnelling]]></category>
		<category><![CDATA[Pasay]]></category>
		<category><![CDATA[projects]]></category>

		<guid isPermaLink="false">http://microtunnelling.com.ph/?p=110</guid>
		<description><![CDATA[The diameter of the installed pipe is 900mm steel casing, 16mm thick. Length of the work is 70m. A 600mm Ø carrier pipe (pipe that will transport the water) will be installed inside steel casing, and the space in between will be grouted. This project is called APM-6 GAPS because this is one of the 'gaps' or uncompleted project from the original project APM. ]]></description>
			<content:encoded><![CDATA[<p><strong>Project Name:</strong> Completion of APM-06 GAPS (600mm Ø) pipe laying Package 3 along Gil Puyat Avenue (Domingo St. – P, Burgos St.), Pasay City<br />
<strong>Date:</strong> completed April/May 2007<br />
<strong>Client:</strong> Linear Construction Corp. for Maynilad</p>
<p>The diameter of the installed pipe is 900mm steel casing, 16mm thick. Length of the work is 70m. A 600mm Ø carrier pipe (pipe that will transport the water) will be installed inside steel casing, and the space in between will be grouted. This project is called APM-6 GAPS because this is one of the &#8216;gaps&#8217; or uncompleted project from the original project APM. The project was secured by Linear Construction Corporation and the pipe-jacking specialty work was subcontracted to Microtunnelling Const. Tech. This was completed on late April 2007.</p>
<div class="ngg-galleryoverview" id="ngg-gallery-11-110">
<p>	<!-- Thumbnails --></p>
<div id="ngg-image-84" class="ngg-gallery-thumbnail-box"  >
<div class="ngg-gallery-thumbnail" >
			<a href="http://microtunnelling.com.ph/wp-content/gallery/apm06/image001.jpg" title="This is a schematic drawing of the project in bird's eye view, showing the pipe line crossing Gil Puyat St. corner Dominga St." class="thickbox" rel="set_11" ><br />
								<img title=" " alt=" " src="http://microtunnelling.com.ph/wp-content/gallery/apm06/thumbs/thumbs_image001.jpg" width="100" height="75" /><br />
							</a>
		</div>
</p></div>
<div id="ngg-image-85" class="ngg-gallery-thumbnail-box"  >
<div class="ngg-gallery-thumbnail" >
			<a href="http://microtunnelling.com.ph/wp-content/gallery/apm06/image003.jpg" title="The dotted line is a sketch of the position in the entry work pit, about 7m below the ground. The illustration also shows the proposed 900mm Ø steel pipe that is going to be installed via pipe-jacking method." class="thickbox" rel="set_11" ><br />
								<img title=" " alt=" " src="http://microtunnelling.com.ph/wp-content/gallery/apm06/thumbs/thumbs_image003.jpg" width="100" height="75" /><br />
							</a>
		</div>
</p></div>
<div id="ngg-image-86" class="ngg-gallery-thumbnail-box"  >
<div class="ngg-gallery-thumbnail" >
			<a href="http://microtunnelling.com.ph/wp-content/gallery/apm06/image005.jpg" title="The 200 ton hydraulic jacking machine used in the project." class="thickbox" rel="set_11" ><br />
								<img title=" " alt=" " src="http://microtunnelling.com.ph/wp-content/gallery/apm06/thumbs/thumbs_image005.jpg" width="100" height="75" /><br />
							</a>
		</div>
</p></div>
<div id="ngg-image-87" class="ngg-gallery-thumbnail-box"  >
<div class="ngg-gallery-thumbnail" >
			<a href="http://microtunnelling.com.ph/wp-content/gallery/apm06/image009.jpg" title="This photo shows the finished pipe-jacking work, ready for cement grouting of steel casing- carrier pipe annulus space." class="thickbox" rel="set_11" ><br />
								<img title=" " alt=" " src="http://microtunnelling.com.ph/wp-content/gallery/apm06/thumbs/thumbs_image009.jpg" width="100" height="75" /><br />
							</a>
		</div>
</p></div>
<div id="ngg-image-88" class="ngg-gallery-thumbnail-box"  >
<div class="ngg-gallery-thumbnail" >
			<a href="http://microtunnelling.com.ph/wp-content/gallery/apm06/image011.jpg" title="The cutting of the sheet piles during the breakthrough of the 900mm Ø pipe-jacking. " class="thickbox" rel="set_11" ><br />
								<img title=" " alt=" " src="http://microtunnelling.com.ph/wp-content/gallery/apm06/thumbs/thumbs_image011.jpg" width="100" height="75" /><br />
							</a>
		</div>
</p></div>
<p>	<!-- Pagination --></p>
<div class="ngg-clear"></div>
</div>
]]></content:encoded>
			<wfw:commentRss>http://microtunnelling.com.ph/2007/05/10/apm-06-gaps-gil-puyat-pasay/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
